The second-phase production workshop of Dongying Linguang New Material Technology Co., Ltd. was put into trial operation on April 20, 2015, mainly for the production of CMC high-viscosity products.

Apr 02,2015


The second-phase production workshop of Dongying Linguang New Material Technology Co., Ltd. was put into trial operation on April 20, 2015, mainly for the production of CMC high-viscosity products.